A suitable installation needs more than cupboard space. Supply, bypass, drainage, commissioning and drinking-water provision all matter.
Survey the location
Measure the cabinet, door opening, pipe routes and space needed to add salt. Confirm access for future service and removal. Check water pressure and flow against the manufacturer’s operating range.
Connections to plan
- Incoming mains and outlet pipework.
- A bypass that allows isolation and continued supply.
- A correctly arranged drain and overflow where specified.
- Power for models that require it.
- The intended unsoftened drinking-water arrangement.
Commissioning
The installer should set the unit for local hardness and household demand, check for leaks, initiate or verify regeneration and explain salt, bypass and maintenance. Keep the model, serial number, settings and warranty paperwork.
Use competent help
Domestic plumbing and water fittings must meet applicable requirements. Use an appropriately qualified installer and check any effect on boilers, warranties and drainage before work begins.
Sources and further checks
Sources are provided for verification. Product specifications and local supply information can change, so check the current primary source before acting.